Trusted by exporters and MNCs across India, EU, MENA & SE Asia
saurabh@geconsultancy.in  ·  +91 8419931666
GECConsultancy
hello@gec-consultancy.com
TVP and Soya Nuggets line
Project 01 · Plant Protein Foods

Soya Nuggets & TVP Plant — 2 MT / hour

An end-to-end texturised vegetable protein and soya nuggets line designed for high consistency, low-density and high-density texturisation across SKUs.

  • Twin-screw extrusion with multi-product flexibility
  • Integrated drying, cooling and sieving
  • Buyer-spec packaging line for domestic & export

Outcome: Commissioned on schedule. Plant ramped to design capacity within the first season.

Soya lecithin processing
Project 02 · Specialty Ingredient

Two Soya Lecithin Plants — 5 MT / day each

Two independently delivered lecithin facilities serving food, nutraceutical and animal-nutrition demand, with quality systems aligned to EU buyer standards.

  • Gum conditioning, drying and quality fractionation
  • Multi-grade output: fluid, deoiled and modified
  • Audit-ready documentation and traceability

Outcome: Both plants commissioned and in continuous production.

Soya flour and grits processing
Project 03 · Bakery & Nutrition

Soya Full Fat Grits & Flour Plant — 1 MT / hour

A combined grits and flour line optimised for stable PDI, bakery functionality and a clean flavour profile — engineered for premium bakery and nutrition brands.

  • Controlled thermal processing for PDI consistency
  • Particle-size flexibility across grits & flour
  • Low-microbial-load packaging environment

Outcome: Steady supply to demanding bakery and nutrition customers.

Organic soyabean meal facility
Project 04 · Organic · Certified

Organic Soyabean Meal Plant — 2 MT / hour

A dedicated certified-organic soyameal facility designed for traceable batch operations and premium export markets.

  • Identity-preserved sourcing and segregation
  • Certified organic, non-GM compliance
  • EU and US buyer-ready documentation

Outcome: Operational and exporting to premium organic buyers.

5Turnkey plants set up
100%Commissioned successfully
2 MT/hrLargest single line
EU + USBuyer-ready quality systems

Planning a similar plant?

We will share an honest first opinion on feasibility, capacity and capex.

Discuss your project